A full remodel removes everything down to the framing, fixes what the walls were hiding, and rebuilds the kitchen around the way your household actually cooks, eats and gathers. In Sioux Falls, most projects of this kind cost roughly $45,000 to $120,000 and take six to ten weeks of construction once materials arrive.
Signs your kitchen needs the full treatment
A dated look alone rarely justifies starting from the studs. A complete rebuild pays off when more than one of these describes your room:
- The layout is the problem. The refrigerator door hits the island, the dishwasher blocks the only drawer stack, or the sink sits on the wrong wall for the window.
- Cabinet boxes have failed. Particleboard bottoms that swelled under the sink, face frames pulling away, or cabinets too shallow for modern appliances cannot be saved by paint.
- Systems are out of date. Two-prong outlets, a single overloaded circuit for the countertop, galvanized supply lines or an undersized gas line all point toward opening the walls.
- You want a different relationship with the rest of the house. Joining the kitchen to the dining room or family room is a structural project, not a cosmetic one.
If only one of those applies, read our comparison of a refresh against a full remodel before deciding. Plenty of Sioux Falls kitchens with good bones need new counters, lighting and cabinet doors rather than a full tear-out.
What a complete remodel includes
A full remodel bundles a dozen trades into one sequence. A good bid lists each of them separately so you can see where the money goes.
| Work | What happens | Typical share of budget |
|---|---|---|
| Design and drawings | Measured plan, elevations, cabinet layout, lighting plan | 4% – 8% |
| Demolition and disposal | Cabinets, counters, flooring, drywall where needed, dumpster | 3% – 5% |
| Framing and structure | Closing doorways, new openings, headers or beams | 0% – 12% |
| Plumbing | New supply and drain lines, gas line changes, fixture hookups | 5% – 10% |
| Electrical | New circuits, outlets, under-cabinet and recessed lighting | 6% – 10% |
| Cabinets and hardware | Boxes, doors, drawers, organizers, installation | 28% – 35% |
| Countertops and backsplash | Templating, fabrication, install, tile | 10% – 15% |
| Appliances | Range or cooktop, oven, hood, refrigerator, dishwasher | 10% – 18% |
| Flooring, drywall, paint | Floor through the room, patching, finishes | 6% – 10% |
The cabinet share stays remarkably consistent across national studies and local bids. If a quote shows cabinets at 15% of a full remodel, something is missing or very low-grade.
What it costs in Sioux Falls
For our multi-state region, the magazine's 2025 study pegs a major midrange kitchen at roughly $80,850. That benchmark assumes a 200-square-foot kitchen with semi-custom cabinets, an island, laminate-or-better counters and new standard appliances. The upscale version, with custom cabinetry, stone counters and professional-grade appliances, comes in around $159,000 for the region.
Local projects often price below those figures because Sioux Falls kitchens tend to be smaller and many homeowners reuse sound flooring or keep the sink where it is. Here is how full remodels usually break out by finish level:
| Finish level | Typical Sioux Falls range | What it looks like |
|---|---|---|
| Builder-plus | $45,000 – $65,000 | Stock or semi-stock cabinets, quartz, same footprint |
| Midrange | $65,000 – $95,000 | Semi-custom cabinets, island added, new appliance package |
| Upscale | $95,000 – $140,000 | Custom cabinetry, layout changes, premium stone |
| Signature | $140,000 and up | Designer-led, panel-ready appliances, structural work |
Taxes shape the number too: the state collects 2% of every remodeler's billings, and in-town purchases of fixtures and finishes pick up 6.2% sales tax. Try the cost estimator to see how size and finish choices move the total.
Permits and the trades who pull them
Because a full remodel touches plumbing, wiring and often walls, it almost always needs city permits. The room you finish will be inspected to today's editions, the 2021 residential and 2023 electrical codes, no matter how old the rest of the house is.
The city also controls who can do the work. Your general remodeler must hold the city's residential building credential. Plumbing must be done by a city-licensed plumbing contractor who also holds a state master plumber license, and electrical work requires a state license plus a city Class B license for residential jobs. Owner-occupants of detached homes are technically allowed to do their own wiring under permit, though very few take that on for an entire kitchen.
Our permit guide covers what each permit involves, the inspections to expect, and the floodplain permit some riverside properties need even for cabinets and counters.
The order of work, week by week
Every remodel varies, but a full Sioux Falls kitchen usually follows this rhythm once demolition starts:
- Week 1: Protection of floors and doorways, demolition, dumpster out, inspection of framing and subfloor.
- Weeks 2–3: Framing changes, rough plumbing and electrical, ductwork for a new hood, then rough-in inspections.
- Week 4: Insulation where exterior walls were opened, drywall, tape and mud.
- Weeks 5–6: Flooring if it runs under the cabinets, then cabinet installation and leveling.
- Week 7: Countertop templating, followed by fabrication, which typically takes one to three weeks.
- Weeks 8–10: Counter install, backsplash, plumbing and electrical trim, appliances, final inspection and punch list.
The biggest scheduling risk is not construction but ordering. Semi-custom cabinets commonly take six to ten weeks to arrive, and custom shops can be longer. A remodeler who orders cabinets before demolition can cut a month from the time you live without a kitchen. Our timeline guide covers the full calendar, including the best months to start.
Details worth getting right in this climate
Sioux Falls winters shape a full remodel in ways a national checklist misses.
Exterior-wall plumbing. A sink under a window on an outside wall is classic, but a supply line in a poorly insulated exterior wall can freeze on a subzero night. When the wall is open, ask for the lines to be kept on the warm side of the insulation, or for the wall to be insulated properly with an air seal behind the sink base.
Range hood makeup air. Powerful hoods pull a lot of air out of a tight house. In a cold climate that air has to come from somewhere, and big hoods can trigger makeup-air requirements under the residential code. Your remodeler should size the hood for your cooktop and your house, not just pick the biggest number.
Wood movement. Dry, heated winter air and humid summers make solid wood expand and contract. Quality cabinet doors use engineered panels or floating centers that tolerate the swing, and painted doors on MDF cores avoid the hairline cracks that can show at joints on painted solid wood.
Water. The city's water is very hard, so build in a filtered water line and talk with your plumber about a softener before the walls close. Scale shortens the life of dishwashers, ice makers and instant hot-water dispensers.

Living through it
A full remodel means four to ten weeks without a working kitchen. The usual workaround is a pop-up station in the dining room or downstairs: the former fridge, a countertop cooker or two and a folding table. Paper plates help. If your basement already has a wet bar, the remodel is a good moment to make that space a little more capable; our lower-level kitchen page explains the options.
Ask how the crew will handle dust. Zip walls, floor protection and negative-air fans are standard on careful jobs, and they matter more in winter when windows stay shut.
How to compare full-remodel bids
When two bids differ by $20,000, the reasons are usually in the details. Line them up and check:
- Whether both include the same cabinet line and construction, such as plywood boxes versus particleboard and full-extension soft-close drawers versus basic slides.
- Allowances for counters, tile, lighting fixtures and hardware, and whether those allowances are realistic for what you picked.
- Who pays for permits and inspections, and whether disposal is included.
- What happens if demolition reveals rot, knob-and-tube wiring or a beam that needs upgrading.
- The payment schedule, the warranty on workmanship and the remodeler's city license number.
Then ask both contractors the same question: what would you do differently in this kitchen? The answer tells you who listened during the walk-through.